World Conference Center Bonn

The ‘Plenary Saal’, designed by architects Behnisch & Partner,was the former parliamentary seat of the German Bundestag from 1992 to 1999. The building then became a conference center and is part of the WorldCCBonn now.

Market

Country

Rental & Staging Rental & Staging
Government Government
Germany

Since the conference center also serves as event location, Leyard LED walls were installed on the sides, suitable for daylight operation. The entire video infrastructure was also completely renewed for this purpose.
In the engineering room there is a Lightware 25G-FR144x144 Hybrid Matrix Router, which is one of the largest systems installed in Germany. It routes broadcast signals and mainly presentations from consumer laptops. Numerous HDMI interfaces of the matrix are connected to six specially configured PCs from Digital AudionetworX (each with several video outputs).
Remote devices are safely connected by fiber optic cable to prevent interference. The video infrastructure in the hall now transfers 4K resolution from source to sink. The final image mixing for video walls and preview displays is performed by an Analogway Ascender 48 Video-DSP, controlled with a touch panel.


Lightware Equipment Used in Project

Source